Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Indexing and Searching E-Learning Content
Indexing and Searching E-Learning Content
Behzad-Vizing Conjecture on Graph Coloring for Product Graphs
Behzad-Vizing Conjecture on Graph Coloring for Product Graphs
Modeling of Deformation in Machining Processes
Modeling of Deformation in Machining Processes
High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
Admissions Apply Now