Back close

Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development

School: School of Engineering, Coimbatore

Project Incharge:Dr. Sreevalsa, Prof. Subbarao
Funded by:BWSSB, Govt of Karnataka

Funding Agency: BWSSB, Govt of Karnataka

Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development

The project titled “Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development” is funded by BWSSB, Govt of Karnataka.  Dr. Sreevalsa, Prof. Subbarao are the investigators of the project. 

Duration of the Project: 1 Year

Related Projects

High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
Burning velocity measurment of biodiesel components using divergent chennal technique and Heat Flux Method
Burning velocity measurment of biodiesel components using divergent chennal technique and Heat Flux Method
Smart Services and Optimization for Microgrids (SSOM)
Smart Services and Optimization for Microgrids (SSOM)
Development of Energy Saver for Induction Motors
Development of Energy Saver for Induction Motors
Transforming Global Health through Computational Cookstove Design
Transforming Global Health through Computational Cookstove Design
Admissions Apply Now