Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Design and Testing of an Optimized Vertical Axis Wind Turbine for Low Wind Speeds
Design and Testing of an Optimized Vertical Axis Wind Turbine for Low Wind Speeds
VLSI Development of Finite Field Arithmetic
VLSI Development of Finite Field Arithmetic
Growth and Fabrication of Blue – Green Lasers for under Water Communication
Growth and Fabrication of Blue – Green Lasers for under Water Communication
Processing and Characterization of Heat Treated Functionally Graded Aluminium (A359) Composites for Aerospace Applications
Processing and Characterization of Heat Treated Functionally Graded Aluminium (A359) Composites for Aerospace Applications
Low Cost Synthesis of CdS Nanostructures
Low Cost Synthesis of CdS Nanostructures
Admissions Apply Now