Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete
Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete
Customizable Product Recommender Systems
Customizable Product Recommender Systems
Shape Optimization of Optical Structures
Shape Optimization of Optical Structures
Design and Testing of an Optimized Vertical Axis Wind Turbine for Low Wind Speeds
Design and Testing of an Optimized Vertical Axis Wind Turbine for Low Wind Speeds
Development of Ultra High Temperature Resistance Polymeric Nano Composite for Long Distance Space Applications
Development of Ultra High Temperature Resistance Polymeric Nano Composite for Long Distance Space Applications
Admissions Apply Now