Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Design and Synthesis of Donor-Acceptor Architectures for Novel Optical Materials
Design and Synthesis of Donor-Acceptor Architectures for Novel Optical Materials
An Intelligent Controller Based Shunt Hybrid Filter for Harmonic Reduction in Adjustable speed drives
An Intelligent Controller Based Shunt Hybrid Filter for Harmonic Reduction in Adjustable speed drives
Hardware Trojan Detection & Consistency based Diagnosis
Hardware Trojan Detection & Consistency based Diagnosis
Experimental Investigation on Structural Integrity Assessment of Dome Shaped Roof Slab of future SFRs
Experimental Investigation on Structural Integrity Assessment of Dome Shaped Roof Slab of future SFRs
Investigation on High Performance Nano Adhesive Bonding of Ultra High Temperature Resistant Polymer and its Performance under Space Environments
Investigation on High Performance Nano Adhesive Bonding of Ultra High Temperature Resistant Polymer and its Performance under Space Environments
Admissions Apply Now