Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
Technology for Sustainable Livelihoods
Technology for Sustainable Livelihoods
Development of Flux TIG, Pulsed TIG Technology for Dissimilar weldments and Corrosion Studies
Development of Flux TIG, Pulsed TIG Technology for Dissimilar weldments and Corrosion Studies
Modernization of Metallurgy Laboratory for Mechanical Testing, Metal Forming and Quantitative Metallurgical Microstructure Analysis
Modernization of Metallurgy Laboratory for Mechanical Testing, Metal Forming and Quantitative Metallurgical Microstructure Analysis
Design and Development of Low Profile Substrate Integrated Dielectric Resonator Antenna for Space Applications
Design and Development of Low Profile Substrate Integrated Dielectric Resonator Antenna for Space Applications
Admissions Apply Now