Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Investigation into the surface integrity of the Titanium Alloys during high speed machining
Investigation into the surface integrity of the Titanium Alloys during high speed machining
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
Modernisation of Dynamics Laboratory for realtime vibration analysis (MODROB)
Modernisation of Dynamics Laboratory for realtime vibration analysis (MODROB)
Automating Anxiety Detection using Respiratory Signal Analysis
Automating Anxiety Detection using Respiratory Signal Analysis
Modernization of Metallurgy Laboratory for Mechanical Testing, Metal Forming and Quantitative Metallurgical Microstructure Analysis
Modernization of Metallurgy Laboratory for Mechanical Testing, Metal Forming and Quantitative Metallurgical Microstructure Analysis
Admissions Apply Now