Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Nanostructured iron-based mixed metal oxide photovoltaic thin films
Nanostructured iron-based mixed metal oxide photovoltaic thin films
Design of Low Weight Shaped Beam Reflector Antenna with Integral IFF and SLB Antenna
Design of Low Weight Shaped Beam Reflector Antenna with Integral IFF and SLB Antenna
Cloud based hybrid pattern recognition approach for fault diagnosis of motor driven rotating machines using motor current signature analysis
Cloud based hybrid pattern recognition approach for fault diagnosis of motor driven rotating machines using motor current signature analysis
Growth and Fabrication of Blue – Green Lasers for under Water Communication
Growth and Fabrication of Blue – Green Lasers for under Water Communication
Parallelizing Low Vision Feature Extraction through GPUs
Parallelizing Low Vision Feature Extraction through GPUs
Admissions Apply Now