Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Synthesis, Characterization and Liquid Crystalline Studies of Schiff Base Containing Porphyrin
Synthesis, Characterization and Liquid Crystalline Studies of Schiff Base Containing Porphyrin
Synthesis of Nanostructured Transition Metal Oxide Thin Film Coatings on Steel Substrates by Dip Coating for Corrosion and Wear Resistance Applications
Synthesis of Nanostructured Transition Metal Oxide Thin Film Coatings on Steel Substrates by Dip Coating for Corrosion and Wear Resistance Applications
Shape Optimization of Optical Structures
Shape Optimization of Optical Structures
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
Automating Anxiety Detection using Respiratory Signal Analysis
Automating Anxiety Detection using Respiratory Signal Analysis
Admissions Apply Now