Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Total Synthesis of modified Berberines – A preliminary anti-cancer study
Total Synthesis of modified Berberines – A preliminary anti-cancer study
Decoding of Turbo Product Codes using Deep Learning Technique
Decoding of Turbo Product Codes using Deep Learning Technique
Durability of High Performance Nano Adhesive Bonding of Aluminium under Aerospace Environments
Durability of High Performance Nano Adhesive Bonding of Aluminium under Aerospace Environments
Investigation on Carbon Nano Fiber Reinforced Polyether Ether Ketone/Polyether Imides as Polymer Composite Container for Long Time Nuclear Waste Disposal
Investigation on Carbon Nano Fiber Reinforced Polyether Ether Ketone/Polyether Imides as Polymer Composite Container for Long Time Nuclear Waste Disposal
Design and development of smart composite structures for active vibration and shape control
Design and development of smart composite structures for active vibration and shape control
Admissions Apply Now