Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Towards Next-generation Adaptable Computing
Towards Next-generation Adaptable Computing
Prototype Design of Low-Cost Biomass to Liquid Fuel System
Prototype Design of Low-Cost Biomass to Liquid Fuel System
Development of Ultra High Performance Polymer-Carbon Fibre Composite for Future Generation Aviation and Defence
Development of Ultra High Performance Polymer-Carbon Fibre Composite for Future Generation Aviation and Defence
Development of Image Fusion Techniques and Measurement Methods to Assess Quality of Fusion
Development of Image Fusion Techniques and Measurement Methods to Assess Quality of Fusion
Design and Analysis of Dual Frequency Quarter-Wave Shorted Microstrip Patch Antenna for Satellite MIMO
Design and Analysis of Dual Frequency Quarter-Wave Shorted Microstrip Patch Antenna for Satellite MIMO
Admissions Apply Now