Lab Course Contents:
| Exp. No | Experiment Details |
| 1 | ASIL compliance in safety critical systems 1. Validate based on ISO26262 (Parts 5 & 6) |
| 2 | Building a project management plan; and, hence, deriving and analysing project requirements |
| 1. Creating a PMP Document 2. Creating an Action Diagram 3. Adding Information to the Project Plan 4. Creating a Project Timeline Diagram 5. Decomposing and Transforming Requirements in a Document 6. Adding Decision, Issue and Query Entities to the Project Database |
|
| 3 | Developing and executing a scenario model |
| 1. Creating the Scenario Mode Physical I/O 2. Creating an action diagram with I/O 3. Creating an Action Diagram to Represent Different Scenarios 4. Decomposing a Scenario 5. Performing Discrete Events Simulation |
|
| 4 | Identifying potential implementation strategies on the scenario model |
| 1. Adding attributes to a class using the Schema Editor 2. Creating Assets with Newly Defined Attributes 3. Creating a Label in the Schema Editor 4. Adding and Organizing New Rover Labels in the Database |
|
| 5 | Identification of the appropriate trade studies |
| 1. Adding Trade Study Artifacts to the Database 2. Inserting the Trade Studies into the Project 3. Connecting the Requirements to the Trade Study |
|
| 6 | Creating of optimized model and its design monitoring |
| 1. Downloading and Extracting / synthesising system CAD File 2. Creating an Asset Hierarchy of the System 3. Adding both Directions of the “References” Relationship to Pinned 4. Creating Artifacts for Existing Asset Entities |
|
| 7 | Creating test cases and suites |
| 1. Adding a “Verifies” Relationship to a module of the system 2. Adding a Traceability Matrix 3. Documenting an Identified Issue 4. Adding Relationships to Finish Tracking the Issue 5. Tracing Issues via a Spider Diagram |
Domains: HVAC, Powertrain, Transmission, Chassis, Braking & tyres, Electrical (battery; recovery;
wiring harness), Infotainment, Sensors, Communications (full stack), ECU, ADAS/AV