Back close

Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete

Project Incharge:Dr. K. M. Mini and Dhanya Sathyan

Duration of the Project: 3 Years

Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete

The principal investigators of the project titled “Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete,” are Dr. K. M. Mini and Dhanya Sathyan. The duration of the project is 3 years.

Related Projects

Video Analytics based Identification and Tracking in Smart Spaces
Video Analytics based Identification and Tracking in Smart Spaces
Reconstructing the events led to the 2023 South Lhonak Glacial Lake Outburst Flood (GLOF) in Sikkim, India
Reconstructing the events led to the 2023 South Lhonak Glacial Lake Outburst Flood (GLOF) in Sikkim, India
Remote Patient Monitoring System
Remote Patient Monitoring System
Development and Fabrication of non-enzymatic Electrochemical Glucose Biosensor and Fabrication of Glucometer
Development and Fabrication of non-enzymatic Electrochemical Glucose Biosensor and Fabrication of Glucometer
An Edge-based Cyber-Physical System for Smart Polyhouse Solar Drying of Agricultural Food Products (Phase-2)
An Edge-based Cyber-Physical System for Smart Polyhouse Solar Drying of Agricultural Food Products (Phase-2)
Admissions Apply Now