- Introduction – Types of estimate – plinth area method – cubic rate method – unit rate method – bay method – approximate quantity from bill method – comparison method – cost from materials and labour – preparation of detailed estimate
- Preparation of detailed estimate using Centre line method
- Preparation of detailed estimate using Long wall – short wall method
- Preparation of detailed estimate for R.C.C Structures.
- Preparation of detailed estimate for Steel Structures.
- Preparation of detailed estimate for roads
- Preparation of detailed estimate for sanitary and water supply works
- Specifications – Detailed specifications for common building materials and items of work as per I.S specifications – Preparation of conveyance statement – Calculation of quantities of materials for items of work – Analysis of rate for items of works required for civil engineering works – Preparation of abstract of estimate of civil engineering works.
- Valuation – types of values – concept of time – value of money – sinking fund – years purchase – Depreciation – obsolescence – valuation of real property – valuation of land – lease and lease hold property.
Programs
- M. Tech. in Automotive Engineering -Postgraduate
- Master of Physician Associate (M.PA) – (Medicine, Surgery) 2 Year -Postgraduate
From the news
- Amrita Vishwa Vidyapeetham and Durham University Sign MoU to Establish International Joint Centre for Energy Resilience and Decarbonisation
- Four-Day Faculty Development Program on CFD, Aerodynamics & DRDO Technologies Held by Mechanical Engineering Department
Others
- Comparative evaluation of shear bond strength of calcium silicate-based liners to resin-modified glass ionomer cement in resin composite restorations – a systematic review and meta-analysis
- Amrita Vishwa Vidyapeetham and Durham University Sign MoU to Establish International Joint Centre for Energy Resilience and Decarbonisation