Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

High Performance Polymeric Composite for Space Applications
High Performance Polymeric Composite for Space Applications
Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Nanostructured iron-based mixed metal oxide photovoltaic thin films
Nanostructured iron-based mixed metal oxide photovoltaic thin films
Synthesis, Characterization and Liquid Crystalline Studies of Schiff Base Containing Porphyrin
Synthesis, Characterization and Liquid Crystalline Studies of Schiff Base Containing Porphyrin
Hardware Trojan Detection & Consistency based Diagnosis
Hardware Trojan Detection & Consistency based Diagnosis
Admissions Apply Now