Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Hybrid Composite for Aviation Applications
Hybrid Composite for Aviation Applications
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
Development of Functionally-Graded Aluminium Metal Matrix Composites and to Investigate the Mechanical and Tribological Properties
GPS Based Location Assisting System
GPS Based Location Assisting System
A Cyber-Physical System for Leak Detection in Water Distribution Networks
A Cyber-Physical System for Leak Detection in Water Distribution Networks
Feature based Transfer Function Design for Volume Rendering
Feature based Transfer Function Design for Volume Rendering
Admissions Apply Now