Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Indoor GIS
Indoor GIS
The Role of Rural Institutions in Enabling Adaptation to Climate Change in the Agricultural Sector across Different Ecosystems in India
The Role of Rural Institutions in Enabling Adaptation to Climate Change in the Agricultural Sector across Different Ecosystems in India
A Behavioral Study of Ransomware – To Develop a Generic Mitigation System
A Behavioral Study of Ransomware – To Develop a Generic Mitigation System
Decoding of Turbo Product Codes using Deep Learning Technique
Decoding of Turbo Product Codes using Deep Learning Technique
Synthesis of intermediates for biologically active molecules
Synthesis of intermediates for biologically active molecules
Admissions Apply Now