Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Development of Surface-Modified Carbon Steel by employing Advanced Surface Engineering Technique
Development of Surface-Modified Carbon Steel by employing Advanced Surface Engineering Technique
Ultralight Weight Fire Composite for Habitat and Bunkers
Ultralight Weight Fire Composite for Habitat and Bunkers
Tri-Band Microstrip Patch Antenna for GPS Application
Tri-Band Microstrip Patch Antenna for GPS Application
Flow Patterns of Oil-Water Immiscible Liquid Mixtures in Small and Microchannels
Flow Patterns of Oil-Water Immiscible Liquid Mixtures in Small and Microchannels
Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Admissions Apply Now